Signalling Projects
Date From Date To Line Site Work Description Softech Scope of Work
Sep-17 Date London to Brighton Gatwick Airport GRIP3-4: Widening of Platform 6, relocating signal, points, changing overlap. Site Surveys, Developing Scheme Plan, preparing design spec., Signal Sighting, all breakin and overrun assessments, IDC and Getting Scheme Approval for GRIP5
Dec-16 Date Cross Rail East Romford  Signalling Power Replacement by a Ring Main arrangement for the entire section of 160 Location Cases. Designing double end fed power supply arrangement, correlation and altering the location designs for the new arrangement. Providing DO Cover.
Jul-16 Date Hammersmith & City - LU Many stations 4LM Project for resignalling using Seltrac CBTC technology from Thales four London Umderground Lines: Hammersmith & City, District, Circle and Metropolitan to improve capacity and reliability. Signalling Design support on Seltrac CBTC designs
Jul-16 Apr-17 Cross Rail Outer Maidenhead Providing Field Engineering to inspect installed assets on site against the Series 1 designs. Redesigning the Series 1 AFC drawings where necessary. Site inspection, preparing site inspection report, fault report and OLE Design.
May-16 Date Bristol  Bristol Station BASRE Project - Bristol Resignalling using SmartLock Signalling Design and Checking Support
Apr-16 Apr-17 Thames Link Three Bridges ERTMS/ETCS rollout design and testing Softech is providing required Design resources
Apr-16 Mar-17 Great Eastern, Stratford to Shenfield Manor Park, Maryland and Seven Kings GRIP4: Signal Sighting validation and reporting for putting foot bridges Signal Sighting Review and Reporting
Oct-15 Jan-16 Midland Main Line Radlett GRIP3: Radlett Freight Terminal (MML) Signalling Scheme development & Railsys Modelling Liaison. GRIP3 - Option development and evaluation. Developing Scheme Solutions for a new freight terminal to be constructed at Radlett on the Midland Main Line (MML).
Sep-15 Nov-15 Lewes to Newhaven Lewes, New Haven Town, New Haven Harbour, New Haven Marine and Falmer Site survey for: Scheme Plan correlation on 34 miles track and Asset Condition Report for 124 Locations, one REB and one Relay Room Creating Correlation pack, site surveys and report production by deploying a team of TIC, MOD 3C and Functional Tester with protection staff.
Aug-15 Date Anglian Line Cholchester Developed 25 Bonding Plans for OLE Structures movement in line with the OLE designs Review the OLE Designs for Bonding Plan alterations, designing the bonding plans and IDC.
Aug-15 Oct-16 Wimbledon Tram Wimbledon Station GRIP4 & GRIP5: Bringing Tram to the existing Wimbledon main line station to reduce passengers walking to more than a mile for Tram to train connection and to improve capacity.  Developing the scheme inc design specs, alteration to mainline signalling systems including SDS, Control Tables, GEC Geographical Control Centre, Location designs, Track Plan, Cable schematic, panel, etc.
Jul-15 Aug-15 Manchester Tram Manchester Tram Management System  GRIP5: Designing Signalling and Telecom system for Manchester Tram Designing layouts, designing system interface and wiring circuits for Axle Counters, Mesh Radio, Vcom Loop, Point Machines and SPAS Signals etc.
Feb-15 Aug-15 East Coast Wood Green to Hitchin and Hitchin to Bawtry GRIP5: East Coast Power Supply Upgarde project. OLE designs and bonding. CRE and Checking of OLE and bonding designs 
Jan-15 Jul-15 London Overground Capacity Improvement Program Richmond Platform 3 Changes to GRIP4 and GRIP5 Designs: For the changes of the signal heads to LEDs, new Track Ckt interrupter, track ckt alterations, OSS relocation and provision of buffer stop over  two stages For each of the two stages design and checking: developed Stage Scheme plan, Design Log, Correlation, SDS, Control Tables, Richmond Relay room, Location designs, Track Plan, Cable and Power Schematics.
Jan-15 Jun-15 Great Western Multiple Signal Engineering Support for Great Western Electrification Project (GWEP) Support to OLE designers and coordination for route section 1-7, reviewing OLE and Civils designs for signal sighting and clash detection, managing interface between LDO and signal sighting model provider (Gioconda), SSF, signalling design changes, Level crossing risk assessment, IDC/IDR.
Dec-14 Jun-15 Control Centres Romford and Cardiff Developed about 20 large Scheme Plans including correlation using Omnicom and site surveys for the two new Control Centres (ROCs) at Romford and Cardiff. Requirment analysis, Scope development support, Scheme Plan, Correlation, Site Surveys, Fringe analysis, IDC
Oct-14 Dec-14 Inland Port Doncaster Inland Port  PWAY Design for feasibility and then for Stage 1 for this new Port PWay Designs: a) Feasibility study and layout over google earth b) Full PWay designs for Phase 1 using OS Tiles.
Jul-14 Dec-14 London Overground Capacity Improvement Program Richmond Platforms 4, 5, 6 and 7 GRIP5: Provision of new buffer stops, fixed redlight,  position detectors repositioning, new Track Circuit Interupter Correlation, SDS, bonding, control tables, Locs design changes, Relay Room,Loc Area Plan, IDC, DO Cover and Handback
Mar-14 Sep-14 West London Clapham Junction GRIP5: Provision of SDO and TRTS on platforms  SDS, SDO and TRTS designs, Locs design changes, Relay Room, Panel, Track Plan, DO Cover and Handback
Mar-14 Aug-14 West London Shephard Bush GRIP5: Provision of SDOs on platforms SDS, SDO designs, Locs design changes, Track Plan, DO Cover and Handback
Feb-14 Jul-14 West London Imperial Wharf GRIP5: Platform Extension inc moving signals and adding banner repeater SDS, Altering TFM Schematic, Control Tables, Relay Room and Locs design changes, Track Plan correlation, IDC, DO Cover and Handback
Dec-13 Jun-14 Sidings Redhill GRIP3,4: Converting a goods loop to a siding Signalling, Telecom (Ops and Retail) to include Site Surveys, Developing Scheme Plan, preparing design spec., Signal Sighting, IDC and Getting Scheme Approval for GRIP5, Detail Design inc Westpack Geographical interlocking design and Handback
Dec-13 Jun-14 Sidings Tattenham GRIP4,5 and 7: Converting a goods loop to a siding Signalling, Telecom (Ops and Retail) to include Site Surveys, Developing Scheme Plan, preparing design spec., Signal Sighting, IDC and Getting Scheme Approval for GRIP5, Detail Design and Handback
Oct-13 Jul-14 Sussex Littlehaven Station-Platform Ext. and Level Crossing GRIP3,4,5 and 7: Platform extension for 12 car operation and updating Level Crossing controls MCB on one side and AHBC on the other side of platforms. Installed over two stages Signalling, Telecom (Ops and Retail) to include Site Surveys, Developing Scheme Plan, preparing design spec., Signal Sighting, IDC and Getting Scheme Approval for GRIP5, Detail Design and Handback
Sep-13 Jul-14 London Bridge Norwood Junction GRIP3&4: Repositioning Signals to mitigate SPADS. Site Surveys, Developing Scheme Plan, preparing design spec., Signal Sighting, IDC and Getting Scheme Approval for GRIP5
Sep-13 Oct-13 Bletchley GRIP7: Final design changes, final record updates and handback Updates to Scheme Plan, Bonding Plan, Loc Area Plan, final design changes to final stage and handback.
Aug-13 Oct-13 Swindon Various New Design of Locations SSI Location Design and checking
Jul-13 Aug-13 Cambrian Pont Briwet Pont Briwet Bridge replacement Telecom CRE role for shifting FTN cables and liaising with a multi-disc. Team
Jun-13 Oct-13 Slough Various New Design of Locations SSI Location Design and checking
May-13 Aug-13 Farnham Farnham Farnham re-signalling design support Design and checking of locations, REB, Cable core, Cable schematics, etc.
Apr-13 Feb-14 Sussex Level Crossing at Fishbourne GRIP5:Level Crossing closure  Alteration to Locations and Relay Room to remove Level Crossing 
Jan-13 Aug-13 Sussex Lewes Station GRIP3: Provision of Banner Repeater Signal Lewes Repeater Signal Appraisal including Signal Sighting and Site surveys
Jan-13 May-13 Various  Manchester GRIP7: Undo design changes not commissioned, final record updates and handback Design to be ‘undone’ due to curtailed installation and commissioning from that designed at GRIP Stage 4+5. Apply Test Logs, final updates and record returns
Jan-13 Apr-13 Four sites Level Crossings GRIP4: National Level Crossing Renewals Package 8 including four level crossings: Alstone, Horton Road, Henwick and Newland East Designing Control Tables, Location Area Plans and other GRIP4 deliverables
Oct-12 Jan-14 Sussex Gatwick Airport GRIP5: Gatwick Airport re-modelling and re-signalling to Smartlock SSI, new platform moving to new control centre at Three Bridges. Detail design support for interlocking, locations, REBs and fringe designs and independent checking
Sep-12 Nov-12 ThamesLink Charing Cross GRIP1/2: Relocation of Relay Room Creating feasibility reports, Option Selection Report and sketches for the relocation of the Relay Room by like for like replacement.
Aug-12 Dec-12 High Speed St. Pancras GRIP5: Interface design Interface design between Cedar Jn REB and High Speed line at St Pancras. Due to design changes to REB circuits, the locations between Cedar Jn REB and St Pancras Junction needed updates.
Feb-12 Dec-12 Manchester to Huddersfield Stalybridge Station GRIP 5: Stalybridge is being re-signalled  with a new free wired interlocking New Location Designs, Bonding Plans, Power Arrangements, Cable core, REB and Fringe designs, etc. 
Dec-11 Apr-12 East Suffork Various station GRIP5: SSI Location designs for 18 locations New SSI Location design containing Point Machine Ckt, Axle Counter, Track Ckt, etc. 
Jul-11 Jan-12 Liverpool to Manchester Line All stations GRIP 3: Improve Line Capacity, Line Speed and Journey times. Review of existing arrangements, Site Survey, production of new Signalling Plan, scheme sketches, Breaking Calcs, Headway Calcs., Signal Sighting and spacing calcs and report for each site. 
Jul-11 Dec-11 Manchester to Leeds All stations GRIP 2: Improve Line Capacity, Line Speed and Journey times. Review of existing arrangements, scheme sketches, Breaking Calcs, Headway Calcs., Signal Sighting and spacing calcs and report for each site. 
Jul-11 Jul-11 Didcot and Chester Line Birmingham Snow Hill Station GRIP2: Platform re-instatement options Produce Scheme Sketches, evaluate options and produce Option Selection Report. CRE with design team was deployed.
Jun-11 Jul-11 Skipton to Carlise Entire line GRIP 2: Improve Line Capacity, Line Speed and Journey times. Review of existing arrangements, scheme sketches, Breaking Calcs, Signal Sighting and spacing calcs and report. 
Jun-11 Jun-11 Runcorn and Frodsham Stations Halton Curve GRIP 3 Option selection and validation to improve line speed. Produce Scheme Sketches, evaluate options and produce Option Selection Report. CRE with design team was deployed.
Apr-11 Jul-11 Peak District to London 6 Sites Asset Condition Survey on six sites including REB and locations to validate GRIP3 Design Proposals Same as in Work Description. Deployed a team of testers and designers with COS and Lookout team.
Jan-11 25-Mar-11 York Holgate York Station GRIP5 Designing and checking control tables for more than 200 routes and designing SSI Locations. Designers and Checker
Jan-11 Feb-11 Preston to Blackburn Hogton GRIP4: Hogton Level Crossing Renewal (AHBC) type including Scheme Development and Design. Scheme Plan, Bonding Plan, Correlation and REB design and checking.
Nov-10 07-Mar-11 West Anglia Main Line Stansted Airport GRIP4 Design Work including Scheme Plan development, FPS, Design Log and Testing Strategy. Designer, Scheme Plan Designer, CAD and Checker
Sep-10 27-Sep-10 Wessex Twickenham and St. Margret Correlation/Site survey and development of the Scheme Plan for Platform extension works. Scheme Plan designer, CAD and checker
Feb-10 Jul-10 Thames Valley Signal Control Reading IECC Train Describer Design Checking of Block Scematic and Stepping Tables. Designers and principle's checker
Feb-10 Jul-10 Edinburgh to Yoker Edinburgh and Yoker IECC Airdrie Bathgate TD Work - Block Schematic and Stepping Table Design for Edinburgh Waverley IECC and Yoker IECC  Designers and principle's checker, CAD for Block Schematic
Nov-09 Feb-10 Various Lines 20 different IECC IECC Upgrade 004 project - Cross-Boundary Signals - design and checking of 340 Screens for Ashford, Liverpool Street, Marlybone, Upminster, Slough, Tyneside, Leeds City, Edinburgh, Yoker, York IECC Designers and principle's checker
Aug-09 Mar-10 North London Line IECC screen design and checking  IECC screen design and checking work, along with some alarm specification amendments. Designers and principle's checker.
Feb-09 May-09 North London Line Train Describer Designing Block Schematic and Stepping Tables for Train Describer System. Designers and principle's checker, CAD for Block Schematic
Feb-09 Apr-09 Thames Valley, Reading  Train Describer Designing Block Schematic and Stepping Tables for Train Describer System. Designers and principle's checker, CAD for Block Schematic
Feb-09 Mar-10 Thames Velley Reading IECC Train Describer Design of Block Schematic and Stepping Tables Designers and principle's checker, CAD for Block Schematic
Oct-08 May-09 Billingshurst GRIP 4 Re-signalling and Extension GRIP 4, design work to develop selected option to full Project Spec. including Signal Design Spec., Scheme Plan, etc. Designers and principle's checker, CAD for Scheme Plan
Sep-08 Mar-10 West Hampstead GRIP5 Re-signalling and Extension GRIP 5, detail design work to develop staged Scheme Plans, re-signalling designs including necessary site surveys, correlation and documentation. Successfully commissioned in three stages. Designers and principle's checker, CAD for Scheme Plan
May-08 Nov-08 Battersea Park  GRIP3 Platform extension GRIP 3 work to develop Scheme Plan options and all the necessary site surveys and documentation for GIP 4 input  Designers and principle's checker, CAD for Scheme Plan
Oct-07 Apr-08 Praed Street Relay Room Amendment to the interlocking arrangements Design and principle's checking including Cadding
Oct-07 Feb-08 Depot Northumberland Park Depot Provision of Continuous Rail Bonding Design and principle's checking including Cadding
May-07 Apr-08 Larbert to Stirling Plean Abolition of existing signal box and installation of new three aspect colour light signalling  between Larbert and Stirling. Transfer of control  to Larbert north Signal Box from Plean. A total re-signalling work between Larbert and Stirling. This included Level Crossing. Design and principle's checking including Cadding- a team of seven designers working including 1 CAD, 4 designers & 2 Principles.
Apr-07 03-Jul-07 Glenfinnan to Fort Williams Annat   Scheme Plan design and development for Level Crossing works Scheme Plan design using the Site Survey as per the Network Rail standards. Design, Cad and Principle's checking
Apr-07 Sep-08 District Whitechapel Correlation, resolving anomalies, Identifying and resolving existing errors, identifying and removing degraded neoprene wiring and replacing it with new wiring. Removing some types of relays. Design & Priciple's Checking
Mar-07 23-Mar-07 Metropolitan Rickmansworth Creating 40" wide 3.5 meter long Illumination Panel drawing, caded to the scale with less than 1% margin of error Cadding and Principle's Checking
Jan-07 Aug-07 District Plaistow, Swiss Cottage, Kensington, etc. Correlation, resolving anomalies, Identifying and resolving existing errors, identifying and removing degraded neoprene wiring and replacing it with new wiring. Removing some types of relays. Design & Priciple's Checking
Jan-07 14-Sep-07 District Elm Park, Degnham, Becontree and Hornchurch Mitigation of Berth Track Deficiencies. Including preparing Correlation Wire Count Packages for all sites, resolving correlation anomolies, doing design changes, commissioning support, master updates, etc. Design & Priciple's Checking
Dec-06 22-Mar-07 Jesmond Metro Newcastle Stage Works: P&C involving nearly 450 source document modifications and checking.  Relay Interlocking design including Book Wiring , Point Control Tables, Location Area Plan . Provided the commissioning support and maintenance prints.
Dec-06 29-Jan-07 Central Laytonstone Replacement of 9300 Points and conversion to FBR Design and principle's checking including Cadding
Dec-06 15-Dec-06 Central Laytonstone CAD Conversion of existing Bonding Plan and ATP Loop Plan Design and principle's checking including Cadding
Nov-06 27-Nov-06 Circle Tower Hill Tower Hill - Interlocking Machine Room Design and principle's checking including Cadding
Sep-06 26-Nov-06 Central Grange Hill Replacement of 9300 Points and conversion to FBR Design and principle's checking including Cadding
Sep-06 17-Sep-06 Central Grange Hill Creating Bonding Plan and ATP Loop Plan Design and principle's checking including Cadding
Jun-06 Aug-06 Waterloo&City Line Waterloo and Bank Waterloo&City Line- phase 2 works Design and principle's checking including Cadding
May-06 Apr-08 Scottish Lines Stirling to Kincaredine Remote Relay Interlocking, Signalling and Scheme plan design for the new line including MCB and AOCL type Level Crossings Onsite design and commissioning support to First Engineering
Mar-06 27-Mar-06 Victoria Kings Corss Victoria Line upgarde enabling works. Emergency Plunger relocation project. Design and principle's checking including Cadding
Feb-06 27-Feb-06 Victoria Victoria, Stockwell, Brixton Victoria Line upgarde enabling works. Coasting Control project Design and principle's checking including Cadding
Dec-05 14-Feb-06 Victoria Kings Corss Victoria Line upgarde enabling works. Kings Cross PEPS, Siding Project Design and principle's checking including Cadding
Jun-05 Aug-05 Central Bethnal Green to Roding Valley Bethnal Green to Roding Valley (Including Hainault Loop) Diagram of Signalling and Current Rail Sections for Traffic Controller Design and principle's checking including Cadding
Aug-04 May-05 Waterloo&City Phase 1 Waterloo and Bank Waterloo and City Line Enhancement  Phase 1 enhancement works  Design and principle's checking including Cadding