OLE Projects
Date From Project Comp. Date Line Track Kms Site Client Work Description Softech Scope of Work
Jun-17 in progress Dee-RE-JP-MD (Group 182,184 & 185) 780 Delhi To Rewari,  Alwar To Jaipur &  Jaipur To Madar Larsen & Toubro Ltd. Design & Approval : Lay out plan, Cross section drawing, Structural erection drawing, Track section substation, Switching station, errected designs as per RDSO (Research Design and Standard Organisation)  Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Apr-17 in progress Ratlam To Kota 250 Ratlam-Nimach-Chanderiya-Kota EMC Ltd. Design & Approval : Lay out plan, Cross section drawing, Structural erection drawing, Track section substation, Switching station, errected designs as per RDSO (Research Design and Standard Organisation)  Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Feb-17 in progress Nallapadu To Pagidipalli  150 Nallapadu - Pagidipalli RE Project Tata Projects Ltd. Design & Approval : Lay out plan, Cross section drawing, Structural erection drawing, Track section substation, Switching station, errected designs as per RDSO (Research Design and Standard Organisation)  Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Sep-16 in progress Hospet-Vasco-da-gama 342 Section Hospet-Vasco-da-gama Sambhrama Design Technology Conducting the preparation of General Power Supply (GPS) diagrams General Power Supply , TSS Location Plan, SP Location Plan & SSP Lacation Plan
Aug-16 in progress Gudivada TO Bhimavaram 53.5 Gudivada TO Bhimavaram Section NCC Ltd. TSS all drawings & Approvals TSS all drawings & Approvals, As Erected Design  for TSS
Jun-15 Sep-15 Bangalore to Mysore 90 Yeliur Station to Mysore Enrich RD Infra Mumbai Railway Electrification project, the existing double line is w/o RE Design & Approval :OHE Designs, LOP, CSD, SED, Sub Station, Transmission stations & BOQ
May-15 Aug-15 Khund To Phulera (Jaipur) 250 Rewari To Phulera  TEE ESS DESIGNERS Chennai Railway Electrification project, the existing Single line is w/o RE Survey & Pegging Plan design
Apr-15 Nov-15 Rewari To Phulera  264 Rewari To Phulera  EMC Power & Quatro Rail JV Railway Electrification project, the existing Single line is w/o RE Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Feb-15 Jun-15 Pune to Wadi 240 Pune to Daund & Gulbarga to Wadi Jn  KEC International Ltd, Delhi Railway Electrification project, the existing double line is w/o RE Design & Approval :OHE Designs, LOP, CSD, SED, Sub Station, Transmission stations & BOQ
Jan-15 Feb-15 Tellapur to RC Puram 8.5 Tellapur to RC Puram Tata Projects Ltd Hyderabad Railway Electrification project, New line connected to existing main line of Hyderabad MMTS Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ
Jan-15 May-15 Nallapadu Diguvimetta 40 Nallapadu Diguvimetta Inabensa JV Delhi Railway Electrification project, the existing Single line is w/o RE Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ
Jan-15 Jun-15 Nallapadu Diguvimetta Nallapadu Diguvimetta Inabensa JV Delhi 4 TSS & 4 SSP/SP
Railway Electrification project, the existing Single line is w/o RE
Design & Approval of SWS Sub Station SP/SSP, TSS & BOQ. 
Jan-15 Sep-15 Gondia To Balharshah 160 Gondia To Balharshah ECI ECC Ltd  Hyd Railway Electrification project, the existing Single line is w/o RE Design & Approval :OHE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Dec-14 Feb-15 Ultra Tech Cement Sdg 11.5 Uruli Station, Pune Division, Central Railway SRC Infra Pvt Ltd, Hyd Introduction of new cement siding at pune, take of point from Uruli station Design & Approval :OHE Designs, LOP, CSD, SED & BOQ
TOTAL Km 2640
DATE CLIENT PROJECT SCOPE OF WORK
Feb 2016 Jacobs East Coast Main Line PSU Upgrade CRE and Checking of OLE and bonding designs 
Feb-June 2015 Parsons Brinckerhoff Signal Engineering Support for Great Western Electrification Project (GWEP) Support to OLE designers and coordination for route section 1-7, reviewing OLE and Civils designs for signal sighting and clash detection, managing interface between LDO and signal sighting model provider (Gioconda), SSF, signalling design changes, Level crossing risk assessment, IDC/IDR.
Apr 2015-Date EMC Power & Quatro Rail JV Railway Electrification of 264 Km between Rewari To Phulera  Survey, OLE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Jan 2015-Date ECI ECC Ltd  Hyderabad Railway Electrification of 160 Km between Gondia To Balharshah Survey, OHE Designs, LOP, CSD, SED, As errected designs & BOQ. SWS Sub Station SP/SSP, TSS & BOQ
Jan 2015-June 2015 Inabensa JV Delhi Railway Electrification Survey and Design of SWS Sub Station SP/SSP, TSS & BOQ. 
Feb-June 2015 KEC International Ltd, Delhi Railway Electrification of 240 Km between Pune to Wadi Survey, OLE Designs, LOP, CSD, SED, Sub Station, Transmission stations & BOQ
May-Aug 2015 TEE ESS DESIGNERS Chennai Railway Electrification of 250 Km between Khund to Jaipur Survey & Pegging Plan design
2012 L & T Hyderabad Metro Rail Project Alignment Design for first section of about 9km
2012 MEGA Metro Link Express for Ahmedabad and Gandhinagar (MEGA) Interface Management, system design and strategic planning
2011- 2013 L & T RINL Vizag Steel Plant Power system Detailed Engineering
2010- 2013 Mumbai Monorail Mumbai Monorail HT Power Supply  Detailed Design for HT Power Supply and Building Services System
2011 Chennai Metro Chennai Metro Phase -1 Pre-tender Advisory – 25kV to M/s TATA Projects for power supply design and build package
2011 DAMEPL Delhi Airport Metro Performing Technical Audit - Earthing and Bonding system of all subsystems viz. Power Supply, LV system, HVAC, SIG, COM, PSD , BHS etc. at stations and trainways. LV power supply system, control power supply system etc. Emergency evacuation routes at stations, depot and trainways. Drainage system of stations. Drainage system of tunnels and viaduct
2011 KMRC Kolkata Metro Pre-temder Design and Technical services for Rehabilitation of Kolkata Metro Trains
2011 RVNL Pune-Wadi- Guntala Railway Pre-tender Services for Railway Electrification - project envisaged 25kV AC electrification of these sections along with few big yards. A total of 7 nos. of traction substations and about 15 nos. switching posts were envisaged in the above‐mentioned sections.
2011 Chennai Metro Chennai Metro Phase -1 Pre-tender Advisory – 25kV to M/s TATA Projects for power supply design and build package